The construction of the ISA Alloy 43 meter – the new semi-displacing aluminum yacht sold in September to her owner – is going on full steam in Ancona.
The construction started with the assembly of the middle part of the lower deck which includes crew areas and guest cabins. By the end of October craftsmen moved to the second section, consisting of the engine and technical rooms. Now, both the fourth section (bow) and the first one (stern) are in construction and will be married to the center ones: by the end of the year, the whole hull will be completed, up to the main deck. Starting in January, it will be time for the upper section (superstructure).
The yacht, designed by LUCA DINI Design & Architecture, features a five-stateroom arrangement with on-deck master stateroom, large salon, dining room and an extra-large beach club allowing guests to be in close contact with the sea, also thanks to the moving transom which rotates back to reach the surface of the water.